CRESTON, Iowa – March 11, 2021 – A project to replace a bridge on U.S. 169 over the middle fork of the Grand River 5.3 miles south of Iowa 2 requires closing the roadway to traffic beginning at 7 a.m. Monday, Apr. 5, weather permitting, until Thursday, July 29, according to the Iowa Department of Transportation’s Creston construction office.
During this project, traffic will be detoured around the work zone with a marked detour route using Ringgold County roads J-55, P-46, and Iowa 2. Permitted oversize loads will be prohibited on this detour route.
The Iowa DOT reminds motorists to drive with caution, obey the posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles, and wear seat belts.
The latest traveler information is available anytime through our 511 system. Visit 511ia.org; call 511 (within Iowa) or 800-288-1047 (nationwide); stay connected with 511 on Facebook or Twitter (find links at https://iowadot.gov/511/511-social-media-sites); or download the free app to your mobile device.
It’s easy to subscribe to Your 511 and sign up to receive the email/text alerts. Visit https://new.511ia.org/#login to sign up. For instructions and help for this feature, visit https://www.511ia.org/help/section/how-to-create-and-manage-a-511-account.html.
#
Contact: Brian Smith at (641) 782-4310 or brian.smith@iowadot.us
Source: iowa DMV