MASON CITY, Iowa – April 4, 2018 – A reconstruction project on Iowa 3 in Waverly will require closing the outside lanes in both directions between First Street NE/SE and Eighth Street NE/SE beginning Thursday morning April 5, weather permitting, according to the Iowa Department of Transportation’s Mason City construction office.
During this closure, traffic will be restricted to one lane in each direction. There will be no on-street parking in the work zone.
The Iowa DOT reminds motorists to drive with caution, obey the posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles, and wear seat belts.
For more information about this and other Iowa DOT construction projects in Black Hawk and Bremer counties, follow the Black Hawk and Bremer County Construction Facebook page at www.facebook.com/BlackHawkBremerCo#!BlackHawkBremerCo.
The latest traveler information is available anytime through our 511 system. Visit 511ia.org; call 511 (within Iowa) or 800-288-1047 (nationwide); stay connected with 511 on Facebook or Twitter (find links at https://iowadot.gov/511/511-social-media-sites); or download the free app to your mobile device.
To receive email or text alerts about traffic incidents, road closures, traffic delays, and other restrictions that affect this highway route or other routes you travel, the Iowa DOT offers the “Your 511” option on 511ia.org. It’s easy to subscribe to Your 511 and sign up to receive the email/text alerts. Visit https://iowadot.gov/511/511-full-feature-website-help/how-to-videos for simple, step-by-step instructions.
#
Contact: Roy Gelhaus at 641-422-1684 or roy.gelhaus@iowadot.us
Source: iowa DMV