Iowa Department of Transportation

Posted by

SIOUX CITY, Iowa – March 12, 2019 – A bridge and pavement replacement project on the Wesley Parkway ramp to southbound Interstate 29 in Sioux City will require closing the ramp to traffic at 8 a.m. Monday, March 18, until Monday, July 1, weather permitting, according to the Iowa Department of Transportation’s District 3 Office. A signed detour (see map) will use Third Street, Pierce Street, Gordon Drive, and Virginia Street.

A pavement replacement project on Floyd Boulevard at I-29 requires closing the roadway to traffic at 8 a.m. Monday, March 25. Motorists will be detoured around the work zone using Virginia Street, Gordon Drive and Dace Avenue (see map) until Monday, July 1.

Godbersen-Smith Construction Company was awarded the $41.8 million road construction project.

The Iowa DOT reminds motorists to drive with caution, obey the posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles, and wear seat belts.

The latest traveler information is available anytime through our 511 system. Visit 511ia.org; call 511 (within Iowa) or 800-288-1047 (nationwide); stay connected with 511 on Facebook or Twitter (find links at https://iowadot.gov/511/511-social-media-sites); or download the free app to your mobile device.

To receive email or text alerts about traffic incidents, road closures, traffic delays, and other restrictions that affect this highway route or other routes you travel, the Iowa DOT offers the “Your 511” option on 511ia.org. It’s easy to subscribe to Your 511 and sign up to receive the email/text alerts. Visit https://iowadot.gov/511/511-full-feature-website-help/how-to-videos for simple, step-by-step instructions.

#

Contact: Dakin Schultz at 712-274-5837 or dakin.schultz@iowadot.us

 

Source: iowa DMV

Leave a Reply

Your email address will not be published. Required fields are marked *